The regrading of topsoil to accommodate the soil reinforcement continues to the top planting level. We are reinstating the brickwork to the lower terrace edging. The works to the bandstand roof are ongoing. The weathervane is being removed for restoration. This week the tarmac surfacing to the upper level will be carried out.